Silver City Planning & Zoning
CURRENT PLANNING AND PERMIT PROCESSING

The Town of Silver City requires the following permits and applications, which are processed administratively. These forms, in Adobe Acrobat format, are availabe for download below. They may aslo be obtained in the Comunity Development Department.

(Download Adobe Acrobat Reader)

Administrative Subdivision Application
Required for any division of a single parcel into two parcels, or a resubdivision in which the combination or recombination or previously platted parcels does not increase the total number of parcels. This applies within Town limits and within the Town's ETZ. A survey is required.

Contact:
Alexandra Perrault, Planner, 534-6349;
aperrault@silvercitymail.com.

Moving Permit
Required prior to the location or relocation of a mobile, manufactured or modular home within Town limits. A site plan showing the proposed location of the home on the lot is also required. The permit must be submitted at least three (3) days prior to moving the structure.
Contact:
Alexandra Perrault, Planner, 534-6349;
aperrault@silvercitymail.com.

Sign Permit
Required prior to the installation of any sign within Town limits, or modifications to a sign that alter the sign size and/or height.
Contact:
Alexandra Perrault, Planner, 534-6349;
aperrault@silvercitymail.com.

Drainage Permit and Floodplain Permits
Required prior to construction.

Contact: Charles Melaney, Engineering / Floodplain Administrator, 534-6368; tsccfm@qwest.net.